Flagship product
BIOSCO Compact Substation
- 250 to 630 kVA
- 20 kV / 22 kV
- Monobloc concrete enclosure
- Outdoor installation
Reduce on-site risk, secure your schedule and commissioning with ready-to-connect substations.
100% of substations accepted before shipment. FAT report and technical file provided with every delivery.
Designed to IEC 62271-202 and ONEE B.01.00.02. Ready to connect on arrival at site.
40 MPa compressive strength, IP25D, IK10. Structural service life > 30 years with no maintenance.
As-built package including drawings, diagrams, FAT test reports and acceptance documents provided for every project.
ETFP controls the entire chain from engineering to delivery. Every substation is manufactured, integrated and tested in-house before shipment — reduced site risk and fast commissioning guaranteed.
Factory in Berrechid — fast response and schedule control.
Inspections, tests and adherence to international standards (IEC 62271-202).
Engineering, manufacturing, integration, delivery and on-site support.
C40/50 vibrated reinforced concrete enclosure, resistant to harsh conditions (IP25D, IK10).
SM6/RM6 switchgear, transformer, LV switchboard and auxiliary services.
Adapted transport, maritime export via Casablanca port (20 km).
Flagship product
1,000 units/year capacity. Progress schedule provided with every order. Standard lead time 2–4 weeks after technical sign-off.
100% of substations factory-tested (FAT). Acceptance report provided. Non-conformity rate on delivery: < 1%.
Wired, integrated and tested to specification. IEC 62271-202, IEC 60076, ONEE B.01.00.02. Ready to connect on delivery.
Engineering & design
Concrete enclosure casting
MV/LV equipment integration
Quality tests & checks (FAT)
Delivery & on-site support
Industry, utilities and infrastructure projects in Morocco and Africa





